Export guide · Lead times · Jodhpur, India

Furniture manufacturing lead times from India, explained stage by stage.

Our typical factory lead time is 30–45 days — from a confirmed specification to a container packed and ready at the port. Here is exactly what happens in those weeks, what starts the clock, and how to make the timeline shorter.

30–45 day typical lead Urgent at premium QC on every piece ISPM-15 export packing
Solid-wood furniture in production at a Jodhpur factory, ahead of export
The honest answer

Most of our furniture ships on a 30–45 day factory lead time.

"How long will it take?" is the first question every serious buyer asks — and a vague answer is a red flag. For solid-wood and handcrafted furniture from Jodhpur, plan on 30–45 days of production once your specification is locked. Décor, planters and metalware often finish sooner; heavily carved, inlaid or large contract loads sit at the top of the range. Ocean transit to your port is separate, and we quote it with every offer so your total door-to-door timeline is clear before you commit.

Before the clock starts

What "lead time" means — and what it does not.

Lead time is the production window — not the whole journey. Quoting, sampling and sample revisions happen before the 30–45 days begin; ocean transit happens after. Separating these three phases is how you build a realistic ship-to-shelf date instead of a guess.

Phase A

Pre-production

Quote, sampling and approval. Sits outside the lead-time clock. Fast sample sign-off here is the single best way to protect your delivery date.

Phase B

Factory lead time

The 30–45 days. Material prep, build, carving/inlay, finishing, QC and export packing. This is the number we commit to on your order confirmation.

Phase C

Ocean transit

Vessel time from Mundra or Nhava Sheva to your destination port. Varies by lane; quoted per shipment with your FOB or CIF offer.

Stage by stage

What happens inside the 30–45 day production window.

An indicative breakdown for a standard solid-wood furniture order. Simple catalogue pieces compress the carving and finishing stages; bespoke, carved or inlaid work extends them. We confirm the exact schedule for your specific order on the proforma.

StageWhat happensTypical position in the window
Material preparationKiln-dried sheesham, mango, acacia, teak or reclaimed stock is cut, graded and moisture-checked; metal, marble and inlay components sourced from our network.Opening days
Construction & joineryFrames assembled, mortise-and-tenon joinery cut, wood-and-iron and knockdown/flat-pack parts machined.Early–mid
Carving, CNC & inlayHand-carving, CNC detailing, bone or mother-of-pearl inlay and brass work — the stage that varies most with design complexity.Mid
FinishingSanding, staining, lacquer or distressing; CARB / TSCA-compliant, low-formaldehyde finishes applied and cured.Mid–late
Quality controlPiece-by-piece inspection against your approved sample; SGS third-party inspection arranged on request.Late
Export packingISPM-15 heat-treated packaging; flat-pack or assembled; retail-ready, branded or Amazon-FBA-ready cartons as specified.Final days

See how we protect pieces in transit on our export packaging and ISPM-15 guide, and how flat-pack affects the build in container loading and flat-pack efficiency.

Compress the timeline

Six ways to get your furniture faster.

1. Approve samples quickly

Sample sign-off is the most common delay — and it is entirely in your hands. Review and confirm the prototype promptly and the production clock starts sooner.

2. Start from catalogue designs

Our ready ODM designs skip the drawing and prototyping cycle. Fully custom (OEM) work is always available, but adds design and sampling time up front.

3. Keep finishes standard

Standard stains and lacquers move fastest. Bespoke colours, heavy distressing and multi-step finishes add curing and rework time.

4. Lock the spec in one pass

Every round of revised drawings or re-samples resets the pre-production phase. A fully-agreed specification up front is the cleanest path to a firm date.

5. Flag urgent orders early

Genuinely time-critical orders can be expedited at a premium — prioritised in the schedule with parallel QC. Tell us the deadline with your enquiry so we can plan the lane and vessel.

6. Consolidate, don't split

One mixed-category container — furniture, décor and metalware together — is produced and shipped on a single timeline instead of several staggered lots.

Order size & terms

Lead time, MOQ and shipping — how they fit together.

A trial or sample order can ship LCL (part-container). For best wholesale pricing thereafter, one 20ft full container load is our standard minimum — and a full container is produced on the same 30–45 day window as a smaller lot, so volume does not stretch your lead time the way many buyers expect. We ship FOB or CIF from Mundra and Nhava Sheva.

QuestionOur answer
Typical lead time30–45 days factory production
Urgent ordersExpedited at a premium
When the clock startsOn confirmed spec + terms
SamplingBefore the clock; ships LCL
Minimum orderTrial LCL · then 1× 20ft FCL
Ships fromMundra / Nhava Sheva · FOB / CIF
Ocean transitBy lane; quoted per shipment
Common questions

Furniture lead times from India — answered.

What is the typical furniture manufacturing lead time in India?

For most solid-wood and handcrafted furniture orders, our factory lead time is 30–45 days from the moment your order, finishes and payment terms are confirmed. Décor and metalware often sit at the shorter end; heavily carved, inlaid or large contract runs at the longer end. Ocean transit to your port is additional and quoted per shipment.

Can you make furniture faster than 30 to 45 days?

Yes — urgent orders can be expedited at a premium, by prioritising your lot in the production schedule and running parallel QC. Choosing catalogue (ODM) designs over fully custom (OEM) work, and approving samples quickly, are the two biggest levers to compress the timeline.

Does the lead time include shipping to my country?

No. The 30–45 day figure is factory lead time — design confirmation through to a container packed and ready at the port. Ocean transit from Mundra or Nhava Sheva to your destination port is separate and depends on your lane; we quote it with your FOB or CIF offer.

How long does sampling take before I place the order?

Sampling runs before the production clock starts. We prototype your piece, finish and construction, and ship the sample LCL so you can approve wood, joinery and colour. Sampling time varies with complexity; confirming the sample promptly keeps the main order on schedule.

What makes a furniture order take longer to produce?

Heavy hand-carving, bone or mother-of-pearl inlay, bespoke CNC work, special finishes, large mixed-category container loads, and multiple rounds of sample revision all extend the timeline. Simple catalogue pieces in standard finishes move fastest.

When does the lead-time clock actually start?

It starts when the specification is locked: designs, dimensions, wood and finish approved, MOQ met, and commercial terms and advance agreed. Everything before that — quoting, sampling and revisions — happens outside the 30–45 day window.