Hospitality & contract · Export only · FF&E to spec

Hotel furniture, built to contract spec and shipped by the container.

We manufacture commercial-grade hotel furniture for FF&E projects worldwide — solid-wood casegoods, lobby and restaurant pieces, outdoor and poolside ranges — made to your drawings, compliance-documented, and consolidated into one container.

Contract-grade build CARB / TSCA finishes FSC · Vriksh · ISO EUDR ready
Commercial-grade solid-wood hotel furniture made in Jodhpur, India
Why contract buyers specify us

Residential looks, contract backbone — and the paperwork a project needs.

Hotel furniture fails on two fronts: it wears out under commercial use, or it stalls at the port because the timber paperwork is missing. We build solid-wood frames to a contract durability standard and document every shipment for FSC, EUDR and US/UK/EU import — so the property opens on schedule and the furniture lasts the refurbishment cycle.

Commercial-grade durability

Solid sheesham, mango, acacia and teak frames with reinforced joinery, commercial-rated foam and fabric, and finishes that take the knocks of daily guest use — not residential-cycle construction.

Whole-property single source

Guest rooms, lobby, restaurant, bar, outdoor and décor in one compliant container — one QC programme, one invoice, one point of accountability instead of chasing five suppliers.

Made to your FF&E spec

We build to the architect's or designer's drawings — your woods, finishes, fabrics and dimensions — as an OEM manufacturer, with a pre-production sample signed off before the run.

Specification at a glance

The numbers a procurement team asks for first.

Hotel FF&E lives or dies on container economics and the compliance file. Here is how we quote, build and ship a project — with flat-pack options to lift container density and documentation handled before your shipment leaves Mundra or Nhava Sheva.

Project parameterOur contract standard
ConstructionSolid-wood frames · reinforced joinery · contract-grade foam & fabric
WoodsSheesham · mango · acacia · teak · reclaimed wood
FinishesCARB / TSCA Title VI low-emission · match to spec
CustomOEM to drawings · CNC carving · pre-production sample
Minimum orderSample / mock-up room LCL · then 1× 20ft FCL, mixed categories
Lead time30–45 days after sample sign-off · urgent at premium
ShippingFOB / CIF from Mundra / Nhava Sheva · flat-pack or assembled
ComplianceFSC · Vriksh · EUDR-ready · Lacey · UKTR · ISPM-15 · SGS
From specification to opening day

How a hotel project runs with us.

01

Share the FF&E package

Send drawings, finish schedules and quantities. We quote FOB/CIF per container with lead times and MOQs.

02

Sample the room

We build a pre-production sample or mock-up room (LCL) so the owner approves wood, finish, fabric and build.

03

Produce & inspect

The property is manufactured and QC-checked over 30–45 days against the approved sample, with full compliance paperwork.

04

Pack & ship to site

Flat-pack or assembled, ISPM-15 packed and consolidated, loaded and shipped from Mundra / Nhava Sheva to the project.

Questions hospitality buyers ask

Hotel furniture — answered.

Do you make commercial-grade hotel furniture that meets contract durability standards?

Yes. Our hotel furniture is built for contract use, not residential cycles — solid-wood frames in sheesham, mango, acacia or teak, reinforced joinery, commercial-rated upholstery foam and fabric, and CARB / TSCA Title VI-compliant low-emission finishes. We build to your FF&E specification and share lot and finish documentation with the order.

Can you manufacture a full FF&E package for one hotel property?

Yes. We consolidate a complete property into one compliant source — guest-room casegoods and beds, lobby and reception pieces, restaurant and bar seating, outdoor and poolside furniture, plus décor and accessories — in mixed-category containers with a single QC programme and one set of export papers.

What is the minimum order and lead time for a hotel project?

A sample or mock-up room can ship LCL for approval. For project pricing, one 20ft full container load (FCL) is our standard minimum, with mixed categories consolidated. Typical production lead time is 30–45 days after sample sign-off; urgent project timelines are accommodated at a premium.

Will the furniture clear customs for a US or EU hotel project?

Yes. We ship with FSC chain-of-custody, Vriksh timber-legality and EUDR-ready geolocation due diligence, plus US Lacey Act declaration support, UK Timber Regulation documentation, CARB / TSCA finishes and ISPM-15 heat-treated packing. Certificate numbers are shared directly with the project buyer on request.

Can you match a designer's drawings, finishes and brand standard?

Yes — we are an OEM manufacturer as well as an ODM house. We build to your architect's or FF&E designer's drawings, match specified woods, finishes, fabrics and dimensions, and produce a pre-production sample so the property owner signs off before the full run begins.

Do you supply furniture for restaurants, bars and resorts as well as hotel rooms?

Yes. The same contract programme covers restaurant tables and chairs, café and bar seating, resort and poolside outdoor furniture, and reception and lounge pieces — all built to the same commercial durability and compliance standard as our guest-room casegoods.

Specify your property

Send your FF&E package and we'll quote the whole property.

Share your drawings, finish schedule and quantities. We'll come back with container pricing, lead times and a sample plan — and the compliance file your project needs to clear customs on arrival.